Skip to content

Excavators Dig Through Tunnels at Liberty University

Small excavators are in the tunnels at Liberty University digging out the dirt.

The dirt is put on a conveyer belt that dumps it outside.

The 4.2 million pound concrete boxes are being pulled through the ground by hydraulic pumps.

You won’t be able to see through the tunnel from the Wards Road side until December.

via WSET

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.